Trusted by Leading Industries and Institutions

Clients

Jeko Electric Group is honored to serve a wide range of clients across Indonesia and the Asia-Pacific region, from state-owned utilities and infrastructure developers to industrial facilities, data centers, and commercial enterprises.
Our clients choose us not only for product quality but also for our technical reliability, responsive service, and long-term partnership approach.

Designing and Manufacturing

Proven expertise in designing and manufacturing high-quality electrical equipment.

Engineering and after-sales service

Integrated engineering and after-sales service for complete system reliability.

Local presence

Local presence with global standards, ensuring fast response and technical excellence.

Quality, safety, and sustainable

Commitment to quality, safety, and sustainable development across all projects.

Jeko Electric Group

Our Clients

Over the years, Jeko Electric Group has become a reliable partner for companies operating in power utilities, heavy industry, infrastructure, and commercial development.

SUMATERA
OUR CLIENTS

SUMATERA

KEPULAUAN RIAU
bluestell
BLUE STEEL INDUSTRY

Project Scope:
Design, supply, installation, testing & commissioning of a 315 kVA MV–LV electrical power distribution system, including transformer, Medium Voltage Cubicle (LBS & CB), LVMDP, Capacitor Bank, and PLN grid connection.

Project Date: Januari 2025

JAVA
OUR CLIENTS

JAVA

bussiness indonesia
PT Balance Business Technology

Project Scope:
Design, supply, installation, testing & commissioning of a 1250 kVA MV–LV electrical power distribution system, including transformer, Medium Voltage Cubicle (LBS & CB), LVMDP, Capacitor bank, and PLN 1110 kVA grid connection.

Project Date: March 2025

1696327348371
PT Anhe Konstruksi Indonesia

Project Scope:
Design, supply, installation, testing & commissioning of a 1250 kVA MV–LV electrical power distribution system, including transformer, medium voltage cubicle (LBS & CB), LVMDP, capacitor bank, PLN 1110 kVA grid connection, and completion of regulatory compliance covering SLO certification and NIDI registration.

Project Date: May 2025

togo
PT. Togo Stell Industries

Project Scope:
Design, supply, installation, testing & commissioning of a 1250 kVA MV–LV electrical power distribution system, including transformer, medium voltage cubicle (LBS & CB), LVMDP, capacitor bank, and PLN 1110 kVA grid connection.

Project Date: August 2025

images
PT. Prima Rasa Food

Project Scope:
Design, supply, installation, testing & commissioning of a 1250 kVA MV–LV electrical power distribution system, including transformer, medium voltage cubicle (LBS & CB), LVMDP, capacitor bank, PLN 1110 kVA grid connection, and completion of regulatory compliance covering SLO certification and NIDI registration.

Project Date: November 2025

panaruk 2
PT Panaruk Industry

Project Scope:
Supply, installation, termination, and testing of LVMDP cubicle and capacitor bank, including ±850 m of low voltage power cabling for main and feeder distribution.

Project Date: September 2025

PT Anugrah Wastra Perkasa

Project Scope:
Design, supply, installation, testing & commissioning of a 1250 kVA MV–LV electrical power distribution system, including transformer, medium voltage cubicle (LBS & CB), LVMDP, capacitor bank, PLN 865 kVA grid connection, and completion of regulatory compliance covering SLO certification and NIDI registration.

Project Date: May 2025

pt-best-mate-indonesia-108
PT. BEST MATE SPORT

Project Scope:
Design, supply, installation, testing & commissioning of a 800 kVA MV–LV electrical power distribution system, including transformer, MV cubicle (LBS & CB), LVMDP, capacitor bank, 350 kVA PLN grid interconnection, construction of the PLN interconnection substation and customer-owned substation, and completion of regulatory compliance (SLO certification and NIDI registration).

Project Date: May 2025

03721636905a2ef042cfe3b12db3a364
PT CHINA CONSTRUCTION YANGTZE RIVER INDONESIA

Project Scope:
Design, supply, installation, testing & commissioning of a 2500 kVA MV–LV electrical power distribution system, including transformer, medium voltage cubicle (LBS & CB), LVMDP, capacitor bank, and PLN 2500 kVA grid connection.

Project Date: October 2025

PT BATANG MINERAL SEJAHTERA

Project Scope:
Design, supply, installation, testing, and commissioning of a 1250 kVA MV–LV power transformer as part of the main electrical distribution system, including MV switchgear, LVMDP, capacitor bank, and PLN grid interconnection.

Project Date: July 2025

20200627_logo-biru-circle-150x150
PT GUNUNG JAYA PRECAST

Project Scope:
Design, supply, installation, testing, and commissioning of a 315 kVA MV–LV power transformer as part of the main electrical distribution system, including MV switchgear, 2 Unit LVMDP, 2 Unit Capacitor bank, and PLN grid interconnection.

Project Date: July 2025

BBP_LOGO-01
PT BARA BLASTING PERKASA

Project Scope:
Design, supply, installation, testing & commissioning of a 1250 kVA MV–LV electrical power distribution system, including transformer, medium voltage cubicle (LBS & CB), LVMDP, capacitor bank, PLN 1110 kVA grid connection, and completion of regulatory compliance covering SLO certification and NIDI registration.

Project Date: April 2025